Lot #4 roadway and signal design
Egis provided traffic counts, traffic modeling, and roadway and signal design services to improve traffic flow, parking lots, and perimeter roadway for Lot #4 and County Road 100 East, east of the TMMI plant. The project involves three new signalized intersections, existing site roadway realignment, and two new access roads for parking lot expansion. Egis analyzed the expected site traffic using Toyota shift change information and worked with Toyota staff to design an access road layout to reduce congestion in and around the facility. Traffic signal design includes battery backup systems, cellular modems for remote access to the cabinets, and the use of wireless vehicle detection.